Reference Number NIA_SPEN_0062
Title DynaLoad – Dynamic loading of transformer insulation
Status Started
Energy Categories Other Power and Storage Technologies(Electricity transmission and distribution) 100%;
Research Types Applied Research and Development 100%
Science and Technology Fields ENGINEERING AND TECHNOLOGY (Electrical and Electronic Engineering) 100%
UKERC Cross Cutting Characterisation Not Cross-cutting 100%
Principal Investigator Project Contact
No email address given
SPEN - SP Transmission Plc
Award Type Network Innovation Allowance
Funding Source Ofgem
Start Date 01 August 2021
End Date 31 December 2025
Duration ENA months
Total Grant Value £200,000
Industrial Sectors Power
Region Scotland
Programme Network Innovation Allowance
 
Investigators Principal Investigator Project Contact , SPEN - SP Transmission Plc (100.000%)
  Industrial Collaborator Project Contact , SP Energy Networks (0.000%)
Web Site https://smarter.energynetworks.org/projects/NIA_SPEN_0062
Objectives Fundamental material research on improved mechanical endurance of winding insulationModelling of the thermo-mechanical impact of rapid dynamic loading on transformer windingsSensor-based condition monitoring of transformers in serviceFine tune business casePresent final report Characterise the plastic deformation of winding insulation materials due to rapid thermal and mechanical stress cyclesDevelop and validate a model that predicts the clamping pressure response due to rapid load and temperature cyclingPerform online monitoring of (clamping) pressure, and temperature in an in-service transformerCommunication and dissemination with stakeholders and working groups To characterise the long-term mechanical endurance of transformer insulation under heavy dynamic loading conditions.
Abstract Dynaload will characterise the long-term mechanical endurance of transformer insulation under heavy dynamic loading conditions through testing and modelling. 
Publications (none)
Final Report (none)
Added to Database 19/10/22